- Discussion with customer for A.C. requirement i.e. Area to be Air-conditioned, Temp. and Humidity requirement, Class of cleanliness, Automation level etc.
- Preparation of preliminary designs with cost estimates along with Heat load estimates and alternatives if any for discussion with Employer and Architects and getting approved.
- Preparation of Tender Documents and Drawings and getting approval for the same from Employer and Architects.
- Preparation of Draft of Order.
- Fire Hydrant System
- HVW/MVW Spray System
- Fire Detection System
- Fire Alarm Services
- Fire suppression System
- Design and Consultancy Services
- AMC of Existing System
- LT Panels, Meter Boards
- AMF panels, Synchroning Panels
- Bus Ducts & Rising Mains
- Internal illumination & wiring
- Power, control cabling & earthing
- Cleaning the both coils and equipment.
- Clean all accessories.
- Grease motors & bearings.
- Check belts, wiring, & motor bushing.
- Check refrigerant gas pressure.
- Replace / clean filters.
- Check all the other parameters.